Laserfiche WebLink
... <br />1 <br />4. (a) Supplemental Field Sketch No. S of this Operating Plan shows <br />proposed <br />th_~ .. -. reads a^,d ~k^?xxxxx.~CYY~O:xkxx~ex3e reads •*ith:.^ .. <br />adjacent to the p~ssd: work area. <br />(b) Access is required to transport the following to work sites: <br />Men, tools, explosives, compressors <br />(Men, tools, explosives, drill rigs, compressors, <br />fiiel. water. timber.machinerv _ <br />fuel, water, timber, machinery, etc.) <br />(c) The access road will be of minimum standard commensurate with <br />the. needs of the operation and will be of temporary <br />(Temporary or permanent) <br />type construction. <br />(d) Road or trail construction will meet S L-10-15 <br />(SL-10-30, etc <br />Forest Service Engineering Design standards and specifications. <br />(e) Construction of the road or trail will not commence until <br />authorization has been given by the District Ranger. <br />(f) Road construction may be authorized by this Operating Plan or <br />by Special Use Permit if it is determined by the authorized <br />officer that a permit is necessary or desirable. <br />(g) Disposal of salvageable timber and debris in the course of <br />clearing operations will be in accordance with the following <br />agreement Timber will be used along the road bed and in the mining operation. <br />(specify plan for disposal) <br />-3- <br />