Laserfiche WebLink
k'~r~ <br />Page 4 Coioredo Department of Public Health and Eriv <br />,: A(r Pollution Contro <br />Lafarge <br />Permit No. ,. r a:! <br />OOPB0495F `~ <br />Initial Approval <br />9. All conveyors and transfer points will be subject to the Naw' Source 'Perforrnanc <br />requirements of Regulation number B, Subpart 000 whenever there: is, primary ixtisl <br />greater than 150- tons per hour (portable equipment) or 25 tons per hour, ($xed equip <br />location as follows: ~ -~: " :: <br />.lI j r£p. ` <br />a. Visible emissions from conveyors and transfer points'shali not`excaed 10 <br />,,' <br />In addition, the following requirements of Regulation No. 6, Part A; Subpart Ar Genera <br />applY• ~ <br />:' ~ ;: <br />p ... <br />a. No article, machine, equipment or process shall be used to conceal an en <br />would otherwise constitute a violation of an applicable standard:-Such <br />InGudes, but is not limted to, the use of gaseous diluants to achieJe cor <br />an opacity standard or with a standard which is based on the cones <br />pollutant in the gases discharged to the atmosphere. (§ 6012) <br />b. Written notification of construction-and inftiai startup dates shall tie sill <br />Division as required under § 60 7 ~ >s > ~ } <br />., <br />c. Records of startups, shutdowris, and malfunctions shall tie maintained, <br />under § 60.7. ' ` -' ~ ° ` <br />,': <br />d. Compliance with opacity standaMs shall be demonstrated accordirig to'J3 <br />,: , <br />ti ~»~ _:; <br />e. At all times, InGuding penotls of start-up, shutdown, and'malfunctibn;; fh <br />,.. <br />control equipment shall, to the'extenf practicable; tiemaintalned`andY <br />manner consistent with good air pollution control practices for.~min(mbin <br />Determination of whether or not acceptable operating ariH maintenance pn <br />being used will be based on irifomiatiorl aJailabia,to_the Division; which- <br />but is not limited to, monitoring results opacity observatlons;~evlew'of d <br />maintenance procedures, and1nspectiorC'of the soui~ca~`(Ref€f~r~e'' <br />A. General Provisions from 40CFR6011) ~ ~ ~'ae~~t ';~ ~, q; <br />10. Within one hundred and eighty days (180) after corrirtlencement'of opera o co pl a <br />conditions contained on this permit shall be demonstrated to,,the,Divislon I is the <br />responsibility to self certify compliance with the ~ntlftio'ns. Failure"to'de~n~~tra~ <br />180 days may result in revocetiori of the perriiit (Information on how to certify oompilana <br />with the permit or can be obtained from the Division at 303-692 3209) i~;~ 3 <br /> <br />' 101/270/1 <br />., <br />,;: <br />:,,.. <br /> <br />:;` ..r; ' <br />