Laserfiche WebLink
needed. This was based upon the commitment to conduct inflow studies if <br />the mine discharge exceeded the predicted discharge (which is the mine <br />inflow) by 20%. This recognizes the fact that perturbations in the <br />discharge rate will be caused by intercepting significant quantities of <br />water, and this will require a new inflow study. It is Empire's <br />intentions to request, through a technical revision, that the requirement <br />to do an annual inflow study be abandoned, and the stipulation numbered 3 <br />of the permit issued October 19, 1983 be reinstated. <br />• <br /> <br />