Laserfiche WebLink
<br /> <br />n <br />U <br />• <br />Since a negative determination of prime farmland was arrived at using <br />the eligibility requirements established for prime farmland under <br />Section 2.04.12, these performance standards do not apply to the permit <br />application. <br />4.25 OPERATIONS ON PRIME FARMLANDS <br />4.25-1 <br />