Laserfiche WebLink
• <br />4.16 POST-MINING LAND USE <br />4.16.1 General <br />Implementation of the detailed reclamation plan as presented in Section <br />2.05.4 will result in a landscape and vegetative cover that is equal or <br />better than the pre-mining condition that currently exists in the area. <br />4.16.2 Determining Pre-Mining Use of the Land <br />The pre-mining land uses for the permit area and adjacent areas are <br />shown on the Pre-Mining and Post-Mining Land Use Map (Map 8). The <br />narrative describing the land use of the permit area is presented under <br />Section 2.04.3. The proposed post-mining land use will involve <br />restoration of the pre-mining land use to undeveloped lands and limited <br />residential use. <br />• The areas of surface disturbance by past underground mining operations <br />will be reclaimed to undeveloped lands since this was the historic land <br />use of the area. <br />4.16.3 Prior to the Release of Lands From the Permit Area in <br />Accordance with 3.03.1(2) <br />• <br />The land use of undeveloped land and limited residential use will be <br />restored in a timely manner as outlined in Section 2.05.4. <br />Implementation of the reclamation plan contained therein will insure a <br />contemporaneous reclamation program following the completion of <br />underground mining. No alternative land uses will be implemented in the <br />reclamation plan set forth under Section 2.05.4. <br />4.16-1 <br />