Laserfiche WebLink
• 4.13 CONTEMPORANEOUS RECLAMATION <br />All reclamation activities, including but not limited to backfilling, <br />grading, topsoil replacement and revegetation, will be carried out as <br />contemporaneously as practical following the completion of all <br />underground mining activities within the area. Implementation of the <br />reclamation plan, as described in Section 2.05.4, will assure that the <br />reclamation process is completed in a timely manner. <br />Following the completion of all underground mining activities, the area <br />will be backfilled and graded. The topsoil which was removed prior to <br />the surface disturbance will be redistributed on the graded area. <br />Revegetation will commence as soon as the topsoil has been redistributed <br />and prepared for seeding as described in Section 2.05.4. The area will <br />be mulched, and the seed mixture described in Section 2.05.4 will be <br />planted as quickly as possible. <br />• <br />• <br />4.13-1 <br />