Laserfiche WebLink
<br />U <br /> <br />Table 23-11 <br />POND DESIGN SUNMARY <br />POND K <br />Three-year Sediment Yield (acre ft) <br />Elevation Three-year Sediment (ft) <br />Volume 10-year, 24-hour Event (acre-ft) <br />Volume Groundwater Pumping (acre-ft) <br />Elevation 30-year, 24-hour Event Plus Pumping <br />Elevation Primary Outlet Invert (ft) <br />Elevation Emergency Spillway Invert (ft) <br />Elevation Crest 25-year, 24-hour Event Plus Pumping (ft) <br />Elevation Design Top of Structure (ft) <br />Freeboard (ft) <br />0.23 <br />8,175.50 <br />2.90 <br />0.56 <br />8,180.23 <br />8,175.60 <br />8,180.23 <br />8,181.07 <br />8,183.6 <br />2.53 <br />23-141 <br />