Laserfiche WebLink
• orifice elevation on the riser pipe. The sedimentation ponds will be <br />cleaned as necessary to maintain adequate sediment storage volume. <br />Tables 23-3 through 23-7, Reservoir Capacity, illustrate the storage <br />capacity of each pond. Figures 23-19 through 23-23, Stage Storage <br />Curve, graphically illustrate the storage capacity of each pond and show <br />3-year sediment, permanent pool, and 10-year and 25-year storm peak <br />stage elevations. <br />Tables 23-8 through 23-12, Pond Design Summary, summarize all design <br />information for each pond. <br />u <br />C~ <br />23-127 <br />