My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136301
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:00 PM
Creation date
11/26/2007 4:29:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pg 780-1 to 780-140
Section_Exhibit Name
PART 780 RECLAMATION & OPERATIONS PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.4 = 45.57 d (0.01)~'~(d)= <br />2.8 <br />• 1.034 = d ~ d' <br />d = 1.3 ft <br />Flow Depth = 1.3 ft <br /> <br />Ditch Depth = 3.0 ft <br />Q=AV <br />V = Q/A = 4.4/Zd1 <br />= 4.4/(1)(1.3)= <br />= 2.6 fps <br />No further sedi++~++t control is proposed is for this area other than controlling <br />the amount of overland flow via the diversion ditch. Based upon the track <br />alignment it is estimated that appmY~~tely 500 CYO will be excavated during the <br />cut and fill process. when the railroad track is reclaimed this material will <br />be returned to back fill the cut area. During the period of usage the cut aryl <br />fill slopes will be seeded with the Pastiseland seed mixture to stabilize the <br />slopes as needed. Zhe fill material will be oonq~acted per the rern,i,-P,,,Pnts of <br />the D&RG1w1. <br />• After the cut and fill work has been coeq~leted, approximately 200 CY of pit run <br />gravel will be hauled in and used for the bed material. The tie and rails will <br />be laid and approximately 200 CY of ballast will be placed around the ties. A <br />deadman or berm may be constructed at the errl of the extension. <br />The railroad track has been transferred to Twentymile dal Company, and TCC will <br />be responsible for reclaiming the railroad after it is no longer rerniired for its <br />operation. Likewise, the railroad track has been removed from Permit Renewal <br />Maps 4 and 5. <br />sedimentation Fords <br />'Ihe existing sedimentation ponds at the F]ieigy Mines No. 1 and 2 are shown on <br />Permit Renewal Maps 9A & 10A. <br /> <br />TR 91-30 780-38 (c) Revised 02/11/91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.