My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136301
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:00 PM
Creation date
11/26/2007 4:29:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pg 780-1 to 780-140
Section_Exhibit Name
PART 780 RECLAMATION & OPERATIONS PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 780.12(b) Continued. <br />into the secondary crushers for reduction to the 2" X 0" size. After <br />secondary crushing, coal is conveyed from the secondary crusher building on <br />a sixty inch belt into a hopper in the sampler building where coal samples <br />can be taken for quality analysis. Once the coal passes through the sampler <br />building, it is conveyed on a sixty inch wide belt for discharge through a <br />stocking tube into the crushed coal stockpile. The coal is then fed by <br />gravity directly into unit trains which pass through a tunnel located <br />beneath the crushed coal stockpile. <br />The detailed flow sheets including air pollution control equipment for the <br />Tipple No. 2 are diagrammed on Figure 19, Truck Dump - Tipple No. 2; Figure <br />20, Primary Crusher Building - Tipple No. 2: Figure 21, Secondary Crusher <br />Building - Tipple No. 2; Figure 22, Sampler Building - Tipple No. 2; and <br />Figure 23, Stockpile and Train Loadout - Tipple No. 2. <br />All conveyors are completed with walkways on both sides of the belt and are <br />• fully enclosed to control emissions. Bag houses are installed in the <br />primary crusher building, the secondary crusher building, and the sampler <br />building. Additional fugitive dust control measures for Tipple No. 2 are <br />discussed in Section 780.15. <br />Drainage from the Tipple No. 2 facility presently passes through <br />sedimentation ponds as shown on Permit Renewal Map 5. These ponds, <br />identified as B and C on Permit Renewal Map 5. have been redesigned to meet <br />the performance standards of Subchapter K as delineated in Section 780.25. <br />.~ <br />CYCC requests a small area exemption for the small disturbed area <br />surrounding the Loadout tunnel on the east side as identified on Permit <br />Renewal Map 5 (Roads, Power Lines and Facilities). <br />CYCC proposes the following sediment control for the small area exemption a <br />seeded vegetative filter, and gravel filter dams in the ditches along the <br />railroad track. The location of these facilities are shown on P.R. t4ap 5. <br />780-36 Revised 06/01/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.