Laserfiche WebLink
sheet 7 of 2 <br />CIRCES Cost Estimatinstl Software <br />PROJECT IDENTIFlCATION <br />Task # <br />Date <br />User: <br />Agency or organiza8on name :OMG <br />008 State :Colorado <br />05/302006 County :Weld <br />ESC Site : Wattenberg West <br />Permit or other job action :New 112 Permit <br />Task descdption :Replace Overburden In areas strfpped In advance of mining <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bn <br />Scraper work team -Scraper Cat 627G <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area :Cat D8R Series 1l - 8SU <br />Road maintenance -Motor grader :NA <br />-W afar truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA NA <br />% Utilization-macfiine . 100 NA NA 100 NA NA <br />-Ripper attachment: NA NA NA 0 NA NA <br />Ownerhip cosUhour : $46.97 NA NA $53.92 NA NA <br />OperetingcosUhour: $131.73 NA NA 575.29 NA NA <br />Ripper op.cosUhour: NA NA NA $0.00 NA NA <br />Operator casUhour : $32.72 NA NA 532.53 NA NA <br />Unit subtotals : 5211.41 NA NA $161.74 NA NA <br />Number of units : 2 0 0 1 0 0 <br />Group subtotals : Work : $422.82 Support : $161.74 Maintenance : $0.00 <br />Total work team cost/hour : 6584.57 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 24,200 CCY factor: 1.125 volume: 27,225 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />Pennitfob # : M-2005-088 <br />Abbreviation :none <br />Filename :M066-0OB <br />II <br />i <br />