My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136297
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:59 PM
Creation date
11/26/2007 4:28:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Permit File
Doc Date
5/17/2000
Doc Name
Cost estimating form
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br /> <br />Task#: 003 State:Cdaado PermiUlob#:M-Y000-041 <br />Dale: OY18R000 County :Pueblo Abbreviation :none <br />User: JOf Site :Evans p2 Filename :M041-003 <br />Permit or other job action :Push Overburden info 50 acre piI <br /> <br />Task description :Reclaim D(sturbed A7aa(no Lake) <br /> <br />HOURLY EQUIPMENT COST Basic machine :Cef OBN (1995) Horsepower : 370 <br />Blase type :Universal <br />Attachment no. 1 :ROPS Ceb Shift basis : 1 per day <br />Attachment no. 2:NA <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown: Ownership cosl/hour: $34.48 NA <br />Operating cosOhour: $81.49 100 <br />Ripper op. cost/hour : 50.00 NA <br />Operator cosUhour: $23.12 NA <br />Total unit cost/hour : 5139.08 Tool fleet cosUhour : 1139.08 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 1,855.333 LCY lagor: <br />Source of quantity fakebR:Ceku/afion <br />Source of est. swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 75 feet <br /> Operator skill <br /> Malenal consistency <br />Unadjusted hourly production : 1559 LCY/Tr Dozing meNod <br /> Visibility <br />Malenal wnsistency description : Job efliaency <br />Loose stockpile Spoil pile <br /> Push gradient <br />Average push gradient: 5.00 %(nep) Altitude: <br /> Material weight <br />Average site altitude : 4,530 feel Blade type <br /> <br />Malenal weight : 2,550 Ibs/LCY Nel wmection <br />Malenal weight description <br />Eanh -Dry pecked Adlusted unit produc8on <br /> Adjusted flee) production <br />JOB TIME AND COST <br />Fleet size: / Dozers) <br />Unit wst: $0.099 /LCV <br />Loose <br />volume: 1,855.333 LCV <br /> <br />0.75 Source <br />levy.) <br />1.20 (Cat HB) <br />1.20 (std) <br />1.00 (avg.) <br />0.83 (1shiNdey) <br />1.00 (doz~c) <br />1.11 ~ (Ca1 HB) <br />1.00 ~ (Cat HB) <br />0.90 (Ce1 HB) <br />1.00 (S or U) <br />0.90 <br />1405.40 <br />1,105.10 <br />LCV/hr <br />LCY/hr <br />Total job time : 13Y0.14 Hours <br />Total job cost : 5183,609 <br />
The URL can be used to link to this page
Your browser does not support the video tag.