Laserfiche WebLink
STATE OF COLORADO <br />Work on this project may proceed. Time will be started indicated in the specifications, as provided for in the contract, or <br />when work is started, as authorized by the Engineer. <br />Very truly yours, <br />RICHARD E. TT <br />Award Officer <br />~; --" . <br />DEPARTMENT OF TRANSPORTATION <br />Contracts and Market Analysis Branch <br />4201 East Arkansas Avenue, 4`" Floor <br />Denver, Colorado 80222 <br />Telephone: (303) 757-9736 <br />Facsimile: (303) 757-9868 <br />September 13, 2006 <br />Flatiron Constructors, Inc. <br />10090 I-25 Frontage Road <br />Longmont, CO 80504 <br />You aze hereby notified that on September 13, 2006, the Department of Transportation received a fully executed Contract <br />and Bond, and acceptable evidence of insurance naming HRH of Colorado as the insurer for Colorado Project No. IM <br />0253-160 located on Interstate 25. We enclose herewith a duplicate and one conforming copy of the contract between this <br />Department and your company. <br />This letter is to verify "Notice to Proceed" given by telephone on September 13, 2006, to the Region Construction Office. <br />IM 0253-160 <br />SIO WCR 16 - WO SH 119 <br />Project Code 12623 <br />NOTICE TO PROCEED <br />REO/reo <br />Cc: <br />Karla Harding (R-4) <br />Dave Davis (R-0) (t contract) <br />James Zufall (R-4) <br />Finals Engineer (R-4) (t contract) <br />R. Ott (CCiI) <br />FHWA (1 contract) <br />T. Smith - Rm 274 <br />J. Loeper/att. (Staff Constr.) <br />D, Aldrich/att.(Federal Aid) <br />P. Valesquez/att. (Federal Aid) <br />CENTRAL FILES (Original Contract) <br />Business Office (R-0) (1 contract) <br />