My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136277
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:58 PM
Creation date
11/26/2007 4:26:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006078
IBM Index Class Name
Permit File
Doc Date
11/13/2006
Doc Name
Original submittal of 111 Op application
From
Flatiron Constructors, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br />15. iyfaus & Exhibits: Submit two (2) complete, unbound copies of the following application exhibits: <br />6.3.1 EXHIBIT A -Legal Description and Location Map <br />6.3.2 EXHIBIT B -Site Description <br />6.3.2 EXIiIBIT C -Mining Plan <br />6.3.4 EXHIBIT D -Reclamation Plan <br />6.3.5 EXHIBTI' E -Maps, to include the location of any recorded easements <br />6.3.6 EXIIIB[T P - List of Other Pemtits and Licenses Required <br />6.3.7 EXHIBIT G -Source of Legal Right-to-Enter <br />6.3.8 EXHIBIT fI -Municipalities Within a'fwo-mile Radius <br />6.3.9 EXHIBIT I - Proof of Filing with County Clerk <br />6.3.10 EXHIBIT J -Proof of Mailing Notices of Permit Application <br />6.3.1 I EXHIBIT K - Terms of Governmental Contract <br />6.3.12 EXHIBIT L -Permanent Man-made Structures <br />1.6.2(1)(b) ADDENDUM I -Notice Requirements <br />6.5 Geotechnical Stability Exhibit (as required) <br />Responsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, there aze a number of <br />itrq~ortant requirements which you, as a permittee, should fully understand. These requirements are listed below. Please read and initial <br />each requirement, in the space provided, to acknowledge that you understand your obligations. If you do not understand these obligations <br />then please contact this Office for a full explanation. <br />1. Your obligation to reclaim the site is not limited to the amount ofthe financial warranty. You assume legal iiability for all <br />lll..~~~ reasonabie expenses which the Board or the Office may incur to reclaim the afTected lands associated with your mining operation <br />/~ in the event your permit is revoked and financial waranty is forfeited; <br />2. 'The IIoard may suspend or revoke this permit, or assess a civil penalty, upon a finding [hat the permittee violated the <br />tetras or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information contained in the application or <br />your permit misrepresent important material facts; <br />3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, substantial <br />civil penalties, to you as permirtee can result; <br />4. Arty modification to the approved mining and reclamation plan from those described in your approved application <br />requires you to submit a new permit application and obtain approval from the Board or Office; <br />5. It is your responsibility to notify the Office of any changes in your address or phone number; <br />G. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the entrance of the mine site, <br />which shall be clearly visible from the access road, with [he following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined [.and <br />Reclamation Board; and, <br />c. ttre permit number. <br />
The URL can be used to link to this page
Your browser does not support the video tag.