My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136273
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:58 PM
Creation date
11/26/2007 4:26:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003016
IBM Index Class Name
Permit File
Doc Date
9/4/2003
Doc Name
Cost Summary Form
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 010 <br />Date : 09/04/2003 <br />User : I(AP <br />County :Weld <br />Site :Heil Sand And Gravel <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or otherjob action :PertnitApplicaiton <br />task description :Grade Topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DSR Sedes 11 - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownershipcost/hour : $44.07 NA <br />Operating cosUhour : $69.76 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cosUhour : $31.83 NA <br />Total unit cosUhour : $145.66 Total fleet cosUhour : $145.66 <br />Initial Swell Loose <br />factor <br />volume <br />3,400 <br />State :Colorado <br />LCY <br />NA <br />volume : 3,400 LCY <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION >. <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 685.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiH/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,850 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.72 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 493.02 LCY/hr <br /> Adjusted fleet production : 493.02 LCY/hr <br />>:. .: <br />JOB TIME AND COST ; <br />Fleet size : 1 Dozers) Total job time : 6.90 Hours <br />Unit cost : $0.295 /LCY Total job cost : $1,005 <br />Permit/job# :M-2003-016 <br />Abbreviation :none <br />Filename :MOl6-Oi0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.