My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136273
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:58 PM
Creation date
11/26/2007 4:26:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003016
IBM Index Class Name
Permit File
Doc Date
9/4/2003
Doc Name
Cost Summary Form
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />008 State :Colorado <br />09/04/2003 County :Weld <br />ICAP Site :Heil Sand And Gravel Mine <br />PermiUjob# : M-2003-018 <br />Abbreviation :none <br />Filename :M016-008 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Application <br />task description :Grade Highwalls <br />HOURLY EQUIPMENT COST <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $44.07 NA <br />Operating cosUhour : $69.76 100 <br />Ripperap.cosUhour : $0.00 NA <br />Operator costlhour : $31.83 NA <br />Total unit cosUhour : $145.66 Total Fleet cost/hour : $145.66 <br />Initial Swell <br />volume : 211,000 LCY factor : NA <br />Loose <br />volume : 211,000 LCY <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 931.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 30.00 % (r <br />Average site altitude : 4,850 feet <br />Matedal weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv Docked <br />Basic machine :Cat D8R Sedes 11 - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.217 /LCY <br />Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shiff/day <br />Spoil pile : 0.80 (fnd-rfJ <br />Push gradient : 1.60 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.72 <br />Adjusted unit production : 669.82 LCY/hr <br />Adjusted Fleet production : 689.82 LCY/hr <br />Total job time : 315.01 Hours <br />Total job cost : $45,885 <br />
The URL can be used to link to this page
Your browser does not support the video tag.