Laserfiche WebLink
iii iiiiiiiiniu iii <br />9 9 <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Wa[er Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watecsta[e.co.us <br />RECEIVED <br />DEC 19 2001 <br />Division of Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />pF CO~\ <br />rryerv SRO, <br />~+ ~(~• <br />~~ <br />~~~ 18]6 r~ <br />Bill Owens <br />Governor <br />Greg E Watcher <br />Executive Direttor <br />Hal D. Simpson, P.E. <br />Stale Engineer <br />DATE: December 19, 2001 <br />TO: Thomas D. Gillis, Senior Environmental Protection Specialist <br />CC: Division 4 Office, District 2S Water Commissioner <br />FROM: Jeff Deatherage, P.E. ~-~ <br />RE: Sea Horse Ranch West Gravel Pit, File No. M-2001-113 <br />Operator: American Concrete and Gravel, LLC, <br />Contact: Dana Gately, 970-641-1712 <br />Section 3, Twp 49 North, Rng 1 East, NM P.M., Gunnison County <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ^reclamation, <br />® water removed in the mined product, ®processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable (see additional comments below). <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />® The stream system at this location is overappropriated, thus a water court approved plan for <br />augmentation is required prior to issuance of a well permit for industrial purposes. <br />® The proposed operation will relocate the Griffin Ditch #1 around the south perimeter of the mined area. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />® The applicant has indicated that the dewatering operation will discharge water onto hay meadows or into <br />irrigation ditches. Applicant cannot divert such water for irrigation purposes unless the water is diverted <br />in priority pursuant to a water right decreed for such irrigation use. <br />® If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it must be <br />released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. Applicant should <br />contact the water commissioner for further information. <br />COMMENTS: Pursuant to Policy 2000-4 of the State Board of Examiners of Water Well Construction and Pump <br />Instaffafion Contractors (Board), no pumping equipment shall be installed in the gravel pit well to <br />withdraw water for any beneficial use, unless a separate written request for variance has been approved <br />by the Board. <br />The applicant may contact the State Engineer's Office with any questions. <br />