My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136259
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:57 PM
Creation date
11/26/2007 4:24:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005077
IBM Index Class Name
Permit File
Doc Date
4/3/2006
Doc Name
Initial Reclamation Liability Estimate
From
DMG grm
To
Upland Gravel Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 05a <br />Date : 04/03/2006 <br />User : GRM <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State :Colorado PermiUjob # : M-2005-077 <br />County :Mesa Abbreviation :none <br />Site :Upland Pit #3 Filename : M077-05a <br />Agency or organization name : DMG <br />Permit or other job action :Initial Reclamation <br />Task description :Pock 3:1 s/opE <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Estimate - 2006 <br />Machine description :Cat 3456 L Series 11(2005) Horsepower : 321 <br />Weight (MT) : 46.57 <br />Ownership cost/hour <br />Operating cost/hour <br />OperatorcosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,420 LCY <br />Utilization <br />$52.26 NA <br />$67.83 100 <br />$32.72 NA <br />$152.80 <br />Swell <br />factor : NA <br /> <br />Shift basis : 1 per day <br />Data source : (CRG) <br />TotalfleetcosUhour: $152.80 <br />Loose <br />volume : 1,420 LCY <br />Source of estimated volume :.44 acres X 43560/27 X 2 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swino loaded. dumo bucket. swino emotvl <br />Basic job condition description <br />Secondaryjob condition within basic description <br />Cycle time value <br />ABOVE AVERAGE <br />AVERAGE <br />0.27 minutes <br />Bucket Caoacitv <br />Rated bucket capacity : 3.00 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 2.55 LCY <br />Job Condition Correction Factors <br />Site altitude : 5,000 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />Source <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shifUday) <br />Net job correction : 0.83 multiplier <br />560.44 LCY/hour <br />465.16 LCY/hour <br />465.16 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 3.05 hours <br />Unit cost : $0.328 per LCY Total job cost : $466 <br />
The URL can be used to link to this page
Your browser does not support the video tag.