My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136259
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:57 PM
Creation date
11/26/2007 4:24:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005077
IBM Index Class Name
Permit File
Doc Date
4/3/2006
Doc Name
Initial Reclamation Liability Estimate
From
DMG grm
To
Upland Gravel Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 02d <br />Date : 04/03/2006 <br />User : GRM <br />Agency or organization name DMG <br />Permit or other job action :Initial Reclamtion Liability Estimate - 2006 <br />task description :final establishment of 3:1 slopes <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2,800 <br />State :Colorado <br />County:Mesa <br />Site :Upland Gravel #3 <br />Basic machine :Cat D8R Series ll - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />OwnershipcosUhour : $53.92 NA <br />Operatingcost/hour : $75.29 100 <br />Ripper op.cosUhour : $1.99 25 <br />Operator cosVhour : $32.53 NA <br />Total unit cosUhour : $163.74 Total fleet cosUhour <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Swell Loose <br />LCY factor: NA volume: 2,800 LCY <br />Source of estimated volume :50% of deposited materials <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Operator skill <br />Average push distance : 50 feet Material consistency <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method <br /> Visibility <br />Material consistency description : Job efficiency <br />Loose stockpile Spoil pile <br /> Push gradient <br />Average push gradient : 30.00 % (neg) Altitude <br />Average site altitude : 5,000 feet Material weight <br /> Blade type <br />Material weight : 2,900 Ibs/LCY Net correction <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production <br /> Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.154 /LCY Total job cost <br />PermiUjob# : M-2005-077 <br />Abbreviation :none <br />Filename : M077-02a <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.60 <br />1.00 <br />0.79 <br />1.00 <br />0.76 <br />$163.74 <br />Source <br />1062.14 LCY/hr <br />1,062.14 LCY/hr <br />2.64 Hours <br />$432 <br />
The URL can be used to link to this page
Your browser does not support the video tag.