Laserfiche WebLink
r~ II I III I II I IIIIII III Doc Date:12/1112001 <br />sss <br />( 4.08 USE OF EXPLOSIVES <br />•\ 4.06.1 General Require <br />Colowyo will comply with all applicable State and Federal laws in the use <br />of explosives. <br />Colowyo will conduct all blasts that use more than five pounds of <br />explosives or blasting agent according to the schedule required by <br />Section 4.08.3. <br />All blasting operations at the Colowyo operation will be conducted by <br />experienced, certified, trained and competent persons who understand the <br />hazards involved. Each person responsible for blasting operations will <br />possess a valid certification in accordance with the appropriate federal <br />and state law. <br />4. 2 Pre-blasting Survey <br />Upon request to the Division by a resident or owner of a dwelling or <br />structure located within one-half mile of any part of the permit area, <br />Colowyo will promptly conduct a pre-blasting survey. A copy of <br />correspondence advising our neighbors of this opportunity is provided in <br />Exhibit 14 - Seismograph Measurements, Item 2. A report of the survey <br />will be submitted to the Division and to the person requesting the <br />survey. The pre-blasting survey will assess the condition of the <br />structure or dwelling and document any pre-blasting damage, including any <br />physical factors which might be reasonably affected by blasting. Such <br />a survey will determine only the surface condition of pipes, cables, <br />transmission lines, wells and other water systems; however, special <br />attention will be given to the pre-blasting conditions of wells and other <br />water systems used for human, animal or agricultural purposes and to the <br />quantity and quality of that water. <br />A written report of any pre-blasting survey will be prepared and signed <br />by the person conducting the survey. This report will include any <br />proposed adjustments to the blasting program which might be necessary to <br />be incorporated or should be incorporated to prevent damage. A copy of <br />the report will be provided to the person requesting the survey and to <br />the Division. <br />4 .3 Public Notice of Blasting Schedule <br />The blasting program at the Colowyo operation will involve the detonation <br />of more than five pounds of explosives or blasting agent in all blasts. <br />Colowyo will annually publish a blasting schedule in the local Craig <br />newspaper. This blasting schedule published in the local newspaper is <br />• <br />4 8-1 <br />Rauision Submitted ! S T ~ ~ Y'S' <br />Revision No. ~' 4N <br />