My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136133
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:49 PM
Creation date
11/26/2007 4:15:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978304
IBM Index Class Name
Permit File
Doc Date
10/11/1978
Doc Name
BLACK CAT PIT FN M-78-304
From
MLR
To
ENVIRONMENT INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiuniiiiii <br />999 <br />October 11, 1978 <br />I3r. Larry O'Brian <br />Environment, Inc. <br />9989 bl. 60th Avenue <br />Arvada, CO 80004 <br />3E: Black Cat Pit <br />Our File 478-304 <br />Dear Mr. O'Brian: <br />The above referenced application is in very good shape. However, <br />the staff needs a few clarifications: <br />1) How close will the north side of the pit approach the seep <br />ditchl <br />2) a) The staff ie concerned that reclamation costa have been <br />underestimated. It appears that you have estimated costs based on <br />a floating bond. However, given the mining timetable of Stage 1 <br />being completed is 1919 and Stage 3 beginning is 1980, it dose not <br />appear that a floating bond is applicable is this case. Even if <br />reclamation on Stage 1 is completed in 1979, it is highly unlikely <br />that bagetation would be established prior to commencaman[ of <br />mining in Stage 3 is 1480. <br />b) Seeds costa appear to have been underestimated. Even if you <br />use a pre-mired drylaad pasture mix, current seed coat w111 run <br />at Least $1226 per pound of grass seed. <br />c) The staff feels that labor costa are underestimated. If the <br />state moat hire a third party contractor co peeform the reclamation <br />labor, labor coat would be around $10.00 per hour. <br />d) Given these conditions, the staff estimated reclamation <br />costs as follow: <br />Oraes seed mixture 13.5/lbs/ac at 1.26/lb ~ $17.00 <br />Pertilizer ~ $15.70 <br />Labor at $10.00/hr for 8 hours ~ 80.00 <br />$112.70/ac <br />
The URL can be used to link to this page
Your browser does not support the video tag.