Laserfiche WebLink
<br /> <br />(e) A plan or schedule indicating how and when reclamation will be implemented. Include: <br />(i) an estimate of the periods of time which will be required for the various stages or phases of <br />reclamation; <br />- Mining Schedule - <br />Section Being Mined Timing Estimate - <br />Pad #1 27 months to mine <br /> 12 months to reclaim <br />Pod #2 44 months to mine <br /> 9 months to reclaim <br />Pod #3 76 months to mine <br />- 9 months to reclaim <br />Pod #4 IS monthsto mine <br /> 9 months to reclaim <br />Pod #5 & Processing Site l9 monthsto mine <br /> 12 months to reclaim <br />Please note that the above schedule is an estimate based on the current market conditions. <br />However, the timing may vary depending upon the demand for construction material and may <br />impact the total life of the mining operation. <br />(ii) a description of the size and location of each area to be reclaimed di[ring each phase,' and <br />Please refer to the Reclamation Plan Map (Exhibit F). <br />(iii) o:[tlining the sequence i[: which each stage or phase of reclamatio[: will be curried our. <br />Please refer to the Reclamation Plan Map for the reclamation sequence. <br />(~ A description of.' <br />(i) finalgrading - maximt[m anticipated slope gradient or erpecred ranges thereof,• <br />All disrurbed areas shall be regraded and smoothed to a finished grade suitable for <br />revegetation. 3:1 slope below high water line; 4: l slope on reservoir banks. <br />,,~,~-; <br />AGGREGATE INDUSTRIES, INC. - MILLIKEN RESOURCE 112 PERMIT PAGE 18 <br />