My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1981010A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2001-12-11_PERMIT FILE - C1981010A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 10:16:42 AM
Creation date
11/26/2007 4:10:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
A Review of Potential Alluvial Valley Floors & Possible Impacts
Section_Exhibit Name
APPENDIX H Section 1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-,r~ <br />l.:../IJ~ ju`d <br />COIiPo HYTroH <br />• avoid damage to the PVC casing caused by the <br />weight or pressure of the cement slurry column, <br />• provide approximately 50 feet of reliable <br />cement seal above the cement basket and <br />the test interval, and <br />• assure displacement of the borehole fluids <br />by the cement slurry. <br />Cement slurries Caere generally mixed at a ratio of <br />about seven gallons of water to each 94 pound bag of cement <br />(7:1). We11 GF-2 cement caas mixed at about 13:1, because of <br />the locaer bursting strength (180 pound/inz) of the plastic tremie <br />pipe used on that well. General Portland Type 2 cement was used. <br />In most cases, 20 sacks of cement Caere slowly added to 132 gal- <br />lons of water in a 220 gallon water tank. The slurry was cir- <br />•~ culated and mixed using the drilling rig's mud pump. <br />The resulting 200 to 220 gallons of 7:1 cement slurry <br />were then pumped down the tremie pipe into the borehole. After <br />pumping the cement slurry, the tremie pipe was removed from the <br />borehole and the cement slurry was allowed to set for 24 hours. <br />3.2.5 Well Bailing and i1e11head Construction <br />Piezometer wells which were drilled using drilling <br />mud were bailed after allowing time for the cement to set up. <br />Bailing caas done by a small well service rig. Bailing caas car- i <br />ried out until clear water was produced from the well. j <br />A cement slurry was poured between the 10-inch steel <br />surface casing and the 4-inch PVC well casing. The cemented <br />~ intervals were typically from land surface to a depth of five feet <br />• ~ <br />3-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.