My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1981010A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2001-12-11_PERMIT FILE - C1981010A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 10:16:42 AM
Creation date
11/26/2007 4:10:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
A Review of Potential Alluvial Valley Floors & Possible Impacts
Section_Exhibit Name
APPENDIX H Section 1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 ~.., ,.:,~:~.~L. <br />cowro.anrwr~ <br />• <br />•) <br />•, <br />3.0 PROCEDURES <br />The following sections describe well siting, well con- <br />struction, and water-level measurement procedures. <br />3.1 Well Site Locatio <br />Three wells were constructed at each of *_he well sites <br />identified on Figure 3-1 as GBB (Big Bottom site), GF (northern <br />mine site), and GZ (southern mine site). Figure 3-2 shows plan <br />views of each well site. <br />Well site GBB is located approximately 600 feet from <br />the Yampa River. The well site is adjacent to a segment of the <br />river where a loss of flow from the river to ground water was <br />identified during flow studies of the Yampa River conducted by <br />Radian in August, 1978. <br />Well sites GF and GZ are Located approximately 6,400 <br />feet apart on a north-south line. '.dell site GF is slightly <br />north (downdip) of the area to be mined. Well site GZ is ap- <br />proximately in the center of the area to be mined. Well sites <br />GF and GZ were located to provide water-level data along a dip <br />section on the southern flank of the Big Bottom Syncline. <br />3.2 Well Construction <br />Nine piezometer wells were constructed by Lyster <br />Drilling, Inc., of Craig, Colorado. All well construction was <br />supervised in the field by Terry Settergren, Radian Corporation <br />hydrogeologist. Three piezometer caells were constructed at each <br />of two sites (GF and GBB) during the period of 13 November 1978 <br />to 22 December 1978. Three additional piezometer wells were <br />constructed at site GZ from 22 January 1979 to 1 February 1979. <br />3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.