Laserfiche WebLink
<br />J. Phase I siltation pond <br />1. Backfill to Z feet above ground water table <br />(1 l feet deep over 13.2 acres) <br />and grade 3:1 slopes to crest <br />2. Replace topsoil, 6" over 13.4 acres <br />3. Seed and Mulch <br />K. Removal of Conveyor Support Structure <br />1. Demolition and Removal <br />Disturba~:ce Costs $ 822,932 <br />Contractor Mob/Demob (8%) 65,835 <br />Overhead (18.5%) 164,422 <br />Administrative (5%) 52,660 <br />TOTAL PROPOSED FINANCIAL WARRANTY <br /> <br />Q[y Units Unit Cost Cost <br />183,150 CY 1.50 275,000 <br />10,800 CY 1.25 13,500 <br />13.4 AC 800 10,720 <br />1 EA 3,000 3,000 <br />$1,105,849 <br />Disturbed Acreage 59.6 <br />Financial Warranty per Acre $18,555 <br />