Laserfiche WebLink
<br />Mr. John Hickman Page 3 <br />Tanabe Pit Substitute Water Supply Pian (M-00-002) <br />April 27, 2000 <br />to include, but not be limited to, long-term evaporation losses. If a lined pond <br />results after reclamation, replacement of lagged depletions shall continue <br />until there is no longer an effect on stream flow. <br />This plan shall be valid through March 31, 2002. Acceptance of these conditions will be assumed <br />unless a letter to the contrary is received by this office within two weeks after receipt of this letter. <br />If this plan is not made absolute by a court action by the expiration date, a renewal of this plan is <br />required. Please contact Megan Sullivan in Denver at (303) 866-3581 or Dave Nettles in Greeley <br />at (970) 352-8712, if you have any questions concerning this approval. We conclude that approval <br />of this plan does not imply a position by our office on any litigation associated with this case. <br />Sincerely, <br />~~~. ~~ <br />Kenneth W. Knox <br />Assistant State Engineer <br />cc: Dave Nettles, Assistant Division Engineer <br />Robert Stahl, Water Commissioner <br />Richard Raines, Tuttle Applegate, Inc. <br />Mark McLean, Rocky Mountain Consultants, Inc. <br />KWK/MAS/mas C:TanabeM00002.doc <br />