Laserfiche WebLink
STATE OF <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Stree[, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAJ( (3031 866-3589 <br />www.water.state.co.us <br />Response to Reclamation Permit Application Consideration <br />Or' a0 <br />aa' <br />he <br />a <br />R r <br />* IA76 ~ <br />8111 Owens <br />Gwemor <br />Russell George <br />EKeative Diseaa <br />Hal D. Simpson, P.E. <br />Sate Engineer <br />DATE: April 18, 2005 <br />TO: Harry H. Posey, Environmental Protection Specialist t~ <br /> RECEIVED <br />CC: Division 2 Office; District 17 Water Commissioner <br />FROM: Don West, P.E. J~" APR 182005 <br /> <br />RE: Schuler Construction Pit #1, File No- M-2005-002 Qisision st Minarals and (sealogy <br /> Operator: Schuler Construction <br /> Contact: Dave Schuler 719/478-2442 <br /> Twp 13 S, ling 60 W, 6th P.M., El Paso County <br />CONIITTIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater- Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: [] evaporation, [] dust control, <br />^ reclatnatlon, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiatitm of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locatiotts of all wells within 600 feet of the permit azea, The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit azea or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />