Laserfiche WebLink
<br />R Ouarrv <br />1?rniect Need -l~atimate market demand for proposed quarry material vexsus overall <br />production in the market area. Betimate proposed quarry market share aver time. <br />Qverell Protect Descrlpt~Qd - Include a timeline refereaeod to maps defining each <br />expected mining/reclamation cycle within all proposed phases. Include the following <br />critical information: . <br />• Estimated atazt and cotxlpletion dates of each cycle <br />• ,A,crcs of disturbed area per cycle <br />• Quantities of materiel to be removed per cycle <br />• Acres of reclaimed area per cycle <br />®ctlvltles Descriodon - Include a b~1ef deactlption of all activities that would be <br />necessary to complete the project. Tha following list of activities ie not itttepded to be <br />all inclusive, but rather representative of the types of activities that should be included: <br />• Access road construction <br /> <br />• Water detentlon/retention construction, operation and maintenance <br />• Water control/diversion structure consavction, operation and maintepatlce <br />• Native material stockpile activity <br />• Blasting activity <br />• Drilling activlty <br />• Material onsite redistribution activity <br />• Material crushing aetiyity <br />• Material loading activity <br />• Material shipping activity <br />• Reclamation activity <br />Per each aetlvity, list all expected impacts and all mitigation measures that would be <br />employed to lessen any impacts. <br />Irrroact Measurements <br />• Nulse - Delineate on a map the 50, 55 and 60 d13 zones underproduction, <br />processing, loadout, drilling and blasting conditions. <br />Zd Wd66:ZT S09Z BI '^~N 6jE0b£SE0£: 'ON XCd Exhibit 80 <br />woad <br />