Laserfiche WebLink
• <br />M~ ~~4 <br />~_ United States Department of the Interior <br />OFFICE OF SURFACE MIPTING <br />Reclamation and Enforcement <br />~'~ POST OFFIC£ BLDG. RM. 770 <br />1x23 57'OiTr STREET <br />DENVER, COLORADO BO7D2 <br />September 7, 1979 <br />Mr. Mark Kerr <br />Herr Coal Company <br />Parr Strip N1 !!ine <br />Box 487 <br />Walden, Colorado 80480 <br />Dear Mr. 8err: <br />During the August 20, 1979 follow-up Snspectlon at the Marr Strip M1 Mine, <br />Violation 4lumber 2 of Notice of Violation Number 79-V-5-18 vea terminated. <br />The termination notice vas dated August 20, 1979. <br />Ae of this letter, St should be noted that abatement of this violation took <br />place an 7uiy 19, 1979, when the required blasting notice was published. <br />Abatement date given oa the Notice of Violation was Suly 23, 1979. The abate- <br />ment of this violation prior to the required abatement date, and not on August 20, <br />1979 as Sndlcated by the service date of the termination notice, is to the <br />operator's favor. ' <br />• <br />A copy of this letter is being sent to the Washington, D.C. Assessment office. <br />Sincerely, <br />, <br />I <br />C` ~.~.G_a~ ~. ,r~, ti~ o~~f <br />Eileen M. Doherty <br />Reclamatior. Specialist <br />cc: Penalty Assessment Office <br />Mr. Dean Massey <br />Don Crane/Mary Wright <br />• <br />