Laserfiche WebLink
<br /> <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 60203 <br />Phone: (303) 8663567 <br />FAX: (303) 832-8106 <br />June 21, 2005 '~ <br />Mr. Mazk D. Campbell <br />SW TKO Joint Venture, LLC <br />333 W. Hampden Ave, Ste. 810 <br />Englewood, CO 80110 <br />Performance Warranty Request -Construction Material Operation <br />r <br />Deaz Mr. Campbell: <br />COLORADO <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />REC LAMATION•M INING <br />SAf ETY•SCIENCE <br />Bill Owens <br />Governor <br />Russell George <br />Executive DireLTOr <br />Ronald W. CatUny <br />Division DireLTOr <br />Natural Resource Trustee <br />On June 9, 2005, the Division of Minerals and Geology approved your 112c mining permit application. The <br />conditions to the approval aze noted below: <br />Prior to exposure of groundwater or any pit de-watering, or installation of the underground recharge <br />wells, the applicant will obtain approval from the Division of Minerals and Geology of a water quality <br />monitoring and mitigation plan in the form of a revision to the permit. A copy of the revision shall be <br />forwarded to the objecting party (Georgia Landms) when submitted to the Division of Minerals and <br />Geology. The water quality monitoring plan must include a plan for collection of baseline or ambient <br />water quality samples, specify the water quality parameters to be monitored, specify a point of <br />compliance, specify the frequency of monitoring and reporting to the Division, and specify a mitigation <br />plan in the event of an exceedence of a water quality parameter. <br />Stinulat~ inrE Nn_ 2 <br />Prior to discharge of mine water into existing ditches, the applicant will obtain approval from the <br />Division of Minerals and Geology for a ditch stabilization and erosion control plan in the form of a <br />revision to the permit. <br />Stinnlatinn Nn_ 3 <br />In order to maintain phased bonding for [he clay liner, the following permit conditions must be followed; <br />• The applicant shall not mine Pond 2 below the groundwater table until Pond 1 is reclaimed to two <br />feet above the groundwater level. <br />• The applicant must begin construction of the slope liner no later than after two phases have been <br />completely mined to bedrock. <br />• The maximum linear feet of slope that may be disturbed and not reclaimed at any given time shall <br />be no greater than 6,000 lineal feet. <br />• Prior to construction of the compacted clay liner, the applicant shall submit a revision to the <br />permit with detailed information on construction of the compacted clay liner and submit a quality <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />