Laserfiche WebLink
<br /> <br />Exhibit "G" <br />Water Information <br />(1) This operation is not expected to directly affect surface or groundwater systems. <br />(2) Since this operation is not expected to directly affect surface or groundwater systems, items (a) <br />(b) and (c) are not necessary. However some of the information is supplied as a matter of course. <br />(a) On the map [here are no water courses except for possibly Smith Hollow which is a dry swail. <br />Neither aze there any wells, except for the windmill, springs, stockwater ponds , or reservoirs on the <br />affected lands or adjacent lands. The Rocky Ford Higltline Canal is shown north of the permit area <br />but will not be affected by the proposed mining operations. <br />(b) There are no known aquifers to be identified. <br />(c) There will be no dewa[ering operation or runoff from disturbed areas. A low berm will be placed <br />azound areas of excavation to prevent runoff into or away from the pit area. A Stomtwater Dischazge <br />Permit and associated Stormwater Manage Plan (SWMP) will be developed for this operation. <br />(3) There will be no water requirements for the development, mining and reclamation phases of this <br />project for this operation. Therefore no flow rates or annual volumes are presented. <br />(4) As stated above no water will be required or involved so [here are no sources of supply. <br />(5) A Stormwater Discharge permit will be applied for from the Water Quality Control Division of <br />the Colorado Department of Health and associated Stormwater Management Plan developed. <br />However, the applicant will not be acquiring or applying for a National Polluant Discharge <br />Elimination System Permit since there will be no discharge. <br />