Laserfiche WebLink
• RBSPONSS: <br />CYCC requests a permit term of 5 years from the date of accep- <br />ranee of an appropriate performance bond by the Colorado Mined Land <br />Reclamation Division. <br />Rule 2.01.6 - Permit Fees <br />(1) Each application for a surface coal mining and reclamation per- <br />mit pursuant to these Rules shall be accompanied by a fee of twenty-five <br />dollars, plus ten dollars for each acre of affected land. <br />(2) The permit fee shall not exceed two thousand five hundred dol- <br />• lars and shall not exceed the actual or anticipated cost of reviewing, <br />administering, and enforcing such permit issued pursuant to these Rules. <br />(3) The cost of the fee may be paid over the term of the permit. <br />The incremental permit fee payment shall not be less than twenty percent <br />of the total permit fee. <br />(4) All fees collected under this Rule shall be deposited in the <br />general fund. <br />RESPONSE: <br />• Pursuant to the Colorado Surface Coal Mining Reclamation Act, a <br />fee of Twenty-five Hundred Dollars ($2,500.00) shall be submitted <br />based upon the acreage encompassed by this application. <br />2.01-8 <br />