Laserfiche WebLink
• (a) Proposed revisions and modifications of said permit must <br /> be submitted within twelve months of the approval by the Secretary of the <br />Colorado regulatory program. <br />(b) Revisions or modifications of said permit are made to re- <br />flect substantive differences between the Colorado regulatory program and <br />the Federal regulatory program, and <br />(c) All requirements of the Act and 2.07, pertaining to public <br />participation and notification, are complied with. <br />BSSPONSR: <br />Since the proposed surface coal mining and reclamation opera- <br /> lions will not take place on Federal land, CYCC is not required to <br />• " <br /> obtain a permit as required by the <br />Surface Mining Control and Re- <br />clamation Act" of 1977 (P.L. 95-87). <br />(6) No permit shall be required for reclamation operations on aban- <br />doned or unreclaimed lands not required to be reclaimed under State or <br />Federal law. <br />BESPONSE: <br />CYCC does not intend to conduct reclamation operations on aban- <br />doned or unreclaimed lands which are not required to be reclaimed <br />under State or Federal law. <br />• <br />2.01-5 <br />