Laserfiche WebLink
C~ <br />~I~ <br />iii iiiiiiiiiiiii iii <br />999 <br />RULE 2 PERMITS <br />2.01 GENERAL REQUIREMENTS <br />Rule 2.01.1 - Scope <br />Doc Date:1211112001 <br />This Section establishes the minimum general requirements for per- <br /> <br />mits required to commence or continue surface coal mining and reclamation <br />operations. The objecCives of this Section are to insure Chat all per- <br />sons make timely application for permits, and that all surface coal min- <br />ing and reclamation operations are conducted only under permits issued in <br />accordance with the requirements of the Act and these Rules. <br />Rule 2.01.2 - General Requirements for Existing Operations <br />Not later than two months following the date of approval of the Col- <br />• <br />orado regulatory program by the Secretary, all operators who are conduct- <br />ing and intend to conduct surface coal mining operations eight months af- <br />ter such approval, shall file an application for a permit with the Div- <br />ision for such operations. The application shall comply with all appli- <br />cable provisions of Rules 2 and 4. With regard to the requirements of <br />2.05.6(3)(b)(iv), the application shall be considered filed if it con- <br />tains all applicable hydrologic information reasonably available to the <br />applicant as of the date of application. <br />2.01-1 <br />