My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1981028A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028
>
2001-12-11_PERMIT FILE - C1981028A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2017 6:51:49 AM
Creation date
11/26/2007 3:54:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
APPENDIX K SURFACE WATER/SEDIMENT CONTROL
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />soil and revegetation study coordinated by Dr. W. Berg, from the physical <br />and chemical properties of three cores, and from the mining plan. The <br />computations were made specifically for the Pit A area of the mining plan <br />but the estimates apply equally well to Pits B and C within the confidence <br />interval of the computations. <br />The quantities of sediment estimated in Table 1 will not be trans- <br /> <br />ported to the pit in their entirety because of deposition. This is par- <br />ticularly true for those that accumulate in the active pit because only <br />a portion of the runoff entering the pit will be pumped to the settlement <br />basin. The sediment delivery ratios used in sizing the ponds are dis- <br />cussed subsequently in this report. <br />COt4PUTATION OF RUNOFF HYDROGRAPH <br />The design of diversion channels and sediment ponds requires know- <br />ledge of the quantity and time distribution of runoff. In the absence <br />of runoff data, the hydrograph was synthesized using the USDA-SCS method. <br />Direct runoff to the sediment pond from the Pit A area will be contributed <br />from sub-areas A and B as described in the above section. Runoff pumped <br />from the active pit to the settlement basin can be controlled relative to <br />both timing and rates and was not considered in the runoff computation, <br />therefore. <br />The runoff hydrograph was synthesized by considering areas A and B. <br />U <br />An SCS curve number of CN = 10 was assigned to Area A. This value accounts <br />for the haul roads that occupy a portion of the area and the fact that <br />the remaining portion will not constitute a "good" hydrologic condition. <br />Area B is the temporarily reclaimed outflow area and this was assigned <br />a curve number of 49. The composite curve number, applicable to the sum <br />of areas A and B is Cn = 61. <br />
The URL can be used to link to this page
Your browser does not support the video tag.