My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135743
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135743
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:26 PM
Creation date
11/26/2007 3:51:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT C-17 CULVERT DRAINAGE BASINS CALCULATIONS SUPPORTING SIZING OF NORTHERN 1 HAUL ROAD CULVERT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />fxNlg/~r t-/7 <br />2308-30 <br />n <br />U <br />NORTHERN COAL COMPANY <br />HYDROLOGIC CALCULATION <br />• <br />• <br />The following calculations are provided to demonstrate a basis for <br />sizing culverts located on Northern Coa] Company's "Northern No. L (FF) <br />Mine Haul Road". <br />The main criteria for design of these culverts is based on the OSM <br />requirements of a 10-year/24-hour storm which should pass "free flowing" <br />through the design culvert. <br />The choice of the hydrologic methods used in quantifying the runoff <br />characteristics of the areas influencing drainage on the "FF Road" was <br />based in part of the size of the drainage areas. Previously planned or <br />existing construction and design was also taken into account. <br />The "FF" road, location and station of the culverts under consideration, <br />and the nearby planned facilities are shown on the accompanying map, <br />"Exhibit B - Culvert Drainage Basin - Northern No. 1. Mine". The drainage <br />areas influencing each culvert location are delineated on this map, <br />corresponding to the areas used in the design calculations. <br />The basic rainfall-runoff characteristics of this area are taken from <br />previous data submitted by Northern Coal: <br />Design Event Precipitation Runoff <br />Recurrence/Interval (In.) In. <br />10 year/24 hour 1.9 .46 <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.