Laserfiche WebLink
<br /> <br />Comment #~: The proposed pit is not compatible with existing and proposed residential uses in <br />the area. <br />DMG Position: The decision as to whether a gravel pit is an acceptable land use in a particular <br />location rests with the local land use authority. The concern witE~ the compatibility of the pit <br />with surrounding uses is outside the Board's jurisdiction, and should be pursued with the local <br />land use authority. It is also noted [hat there are numerous reclaimed gavel pits in the <br />immediate vicinity, and a number of active pits. A large portion of the proposed permit area has <br />been used for many years as a public sale sand and gravel yard and concrete plant. <br />Comment #6: Objection to the proposed location of the asphalt batch plant primarily as an issue <br />of land use compatibility. <br />D1~IG Position: Land ttse compatibility issues are not within [he Board's jurisdiction. The <br />decision as to whether a gravel pit is an acceptable land use in a particular location rests with the <br />local land use authority. The Board is primarily concerned with the reclamation of trained land <br />and the minimization of environmental impacts during mining. The objector is encouraged to <br />pursue land use compatibility concerns with the County. <br />Comment #7: Objection to [he proposed location of the asphalt batch plant as an issue of public <br />health, safety, and welfare. <br />DMG Position: This is an issue that is within the Boards jurisdiction. The objector was <br />encouraged to be more specific as to the nature of your concerns for them to be considered in the <br />permitting process. The following issues are pertinent and were provided to the objector: <br />The primary health concern that may be associated with an asphalt batch plant is air <br />pollution. However, all asphalt batch plants in the State of Colorado must obtain and <br />comply with the requirements of an Air Pollution Emission Notice issued by the <br />Colorado Department of Public Health and Environment. <br />Another health and welfare concern that is attributed to asphalt plants is noise. As stated <br />previously, the appropriateness of the location for a gravel pit and appurtenances such as <br />asphalt plants is a local decision. All gravel pits create noise impacts, so the Board leaves <br />the decision of ]and use compatibility related to noise in the hands of the local land use <br />authority. <br />r The potential for ground water and surface water impacts is also occasionally raised as a <br />concern for asphalt batch plants. The Loveland Pit operation will be required to obtain a <br />storm water discharge permit from the Colorado Department of Health and Environment. <br />This permit requires the preparation of a Storm Water Management Plan and typically <br />includes a Spill Prevention, Containment, and Countermeasures Plan. A copy of these <br />plans has been included in the reclamation permit application. <br />No specific concerns have been provided, and the objector did not participate in [he Informal <br />Conference held on July 20, ?000. <br />