CATERPILLAR INC.
<br />FLEEP Pf~DIIClZCN AND OOST ANALYSIS
<br />ESPII+~.TID OO.SPS TO REPiACR `inPSOII, AT SEVEXA MINE
<br />SENDCA RDCL. BOIL PWOC 23-NC7~7-93 Page - 6-
<br />Overall Production aryl Cost Surmoaty FPC-2a1
<br />SENDC'A RD3.. BOND
<br />•
<br />Fleet
<br />Name Cause
<br />Name Material
<br />Qty `iCkTS TONS per
<br />Sc]1ed Hr Sched Hrs
<br />Required
<br />$ Zbtal $
<br />per `IUN
<br />TS REPL E cunt 1,590 1,234 1 1,108 0.697
<br />TS RERL O 87,185 1,064 82 70,423 0.808
<br />TS RERI, O aunt 9,340 979 10 8,204 0.878
<br />TS REPL IS, 41,810 708 59 50,737 1.214
<br />TS REPL LI, coat 71,325 1,870 38 32,786 0.460
<br />TS REPL II 6,940 1,642 4 3,633 0.523
<br />TS REPL II contl 40,460 1,548 26 22,465 0.555
<br />TS RFPL II oont2 48,875 872 56 48,203 0.986
<br />TS REPL P 14,390 1,931 7 6,408 0.445
<br />TS RE~I. P oD11t 640 1,931 0 285 0.445
<br />TS REPL NN 304,680 1,038 293 252,244 0.828
<br />TS REPL KK 13,040 2,638 5 4,250 0.326
<br />TS REPL KK opnt 14,990 1,540 10 8,369 0.558
<br />TS RERi, HH 53,160 881 60 51,848 0.975
<br />TS RF3?i, HEi Contl 27,930 1,126 25 21,331 0.764
<br />TS REPL fIIi cont2 23,025 2,176 11 9,099 0.395
<br />TS REPL HEi cont3 62,130 990 63 53,977 0.869
<br />TS RE~I, HH oont4 30,780 876 35 30,196 0.981
<br />
<br />
|