Laserfiche WebLink
CATII2PII,IAR INC. <br />FLEET PRODUCiTON AND OOST ANALYSIS <br /> <br />F5'PII~4ATTD OOSIS TU RRPf A('F: TOPSOIL AT SENECA MINE <br />SENFX'A RECL. BODID PWCC 23-NOV-93 Page -54- <br />Productivity and Cost -- TS RFPL -HH oontl FPC-lc2 <br />• <br />Qty & idodel 4.637E <br />BCY /Load ( 2,518 Lbs/BCY). 25.54 <br />Hauler - Payload, TONS....... 32.16 <br />- ~ of Rated Payload.. 85.8 <br />Load Time, Minutes .......... 1.00 <br />"-uler Cycle T <br />Inad ........................ <br />Haul .. ...................... <br />Dump and Maneuver............ <br />Return.. ........ ... <br />Potential Cycle Time.. <br />Wait on Slow Hauler.......... <br />Wait to Lcad ................. <br />Total Cycle Time...... <br />1.00 <br />2.87 <br />0.60 <br />1.22 <br />5.69 <br />0.00 <br />5.69 <br />tential Productio <br />TONS /Hour Avg MPH <br />637E 1,356 12.0 <br />erating Schedul <br />Operating Efficiency 83% <br />Scheduled Hrs/Year 1,500 <br />Fleet Availability 100.0$ <br />TONS /Sched Hr 1,126 <br />Total TONS 27,930 <br />SChed Hrs Reqd 25 <br />Tbtal $ 21,331 <br />$ per TUN 0.764 <br />TONS /Year 1,688,576 <br />Years RE'1~1 ~ i red 0.02 <br />HAUL - Travel Time & Speeds <br />SENECA RDCL. BODID <br />Course <br />Name Course <br />Desc Material <br />Qty TUNS Density Ibs per <br />ICY BCY Initial <br />Speed <br />HH contl Highline Fd 27,930 2,075 2,518 0.00 <br />HAUL Distance Rollirg C=Yade MPH Potential ~oent Speed- Cumulative <br />Segment FEET Resist$ $ T•imit Speed Max at End Mimites <br />3,000 5.00 3.30 35.00 12.31 12.31 0.00 2.87 <br />HAULER <br />Model 637E <br />ID SENECA <br />• <br />