My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135634
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:21 PM
Creation date
11/26/2007 3:43:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
4.0 Exhibits and Figures Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-15~~ <br />layer should be placed immediately beneath the slabs. The gravel <br />• should have a maximum -200 sievc content oC 10~, at least 50% <br />retained on the No. 4 sieve and a maxirtium size of 2 inches. <br />SEDLt•IENTATION FOND <br />The proposed sedimentation pond will be constructed mainly by <br />cutting below the natural ground :surface and filling on the down- <br />hill side. Cut and till slopes are proposed to be 2 horizontal <br />to 1 vertical. Percolation tests were performeo in the proposea <br />sedimentation pond area and laboratory permeability tests were <br />performed to help assess seepage loss front the pond area. The <br />percolation rates cbtained under relatively low head indicate <br />seepage loss could be substantial. The laboratory tests indicate <br />• isolated clay layers could be relatively impervious. <br />Based on tte test results, it appears that lining should be <br />provided to reduce the seepage lcss. We expect that the on-site <br />clays can be used as a liner provided some seepage loss is <br />acceptable. A minimum two-foor, thick clay liner should be <br />used. The clay material should have at least 60% passing the No. <br />200 sieve and a minimum liquid limit of 30. Bentonite may be <br />added to further reduce the liner permeability. The fill portion <br />of the pond embankment should ccnsist, of predominant clay like <br />the soil liner. Embankment and ]finer materials should be <br />compacted to at least 95$ of standard Proctor density (ASTN D698) <br />at a moisture content near optimurti. <br /> <br />Chen & Associates <br />