~~ <br />RECLAMATION COSTS <br />• EXHIBIT L <br />This reclamation cost estimate in based on the assumption that <br />there will be no more that 20.00 acres t disturbed at any one time. <br />It also assumes, that when it comes time to recoil the SLAB rock area <br />that only 12 inches of soil would be spread over the disturbed area. <br />The remaining overburden piles would be graded and seeded. At that <br />time we will have to respread 24,200 cubic yards of topsoil. The time <br />when the most bank sloping would be necessary is either at the <br />beginning of mining when the excavated area would have slope on all <br />four aides that needed sloping. On a 25 ac. Area with would mean <br />there are 4100 linear feet (LFT) around the exterior of the hole. <br />Using the numbers shown on the typical cross section on page 17 and <br />assuming that since sloping would run concurrent with mining <br />approximately 508 of the cut/fill work would be done and 258 of the <br />rock fill would be left. The table below outlines the various areas <br />of disturbance at that time. A D-9 dozer will be used to do the <br />shaping and recoiling. The revegetation cost figure for the slab rock <br />area includes fertilizer, grass seed, mulch and drilling costs. The <br />revegetation cost for the surface rock area is only covers raking, <br />fertilizer and seed. <br /> STAGE TOTAL SOIL DEPTH <br /> N EEOS RES OILING 1 5.0^ 6~ <br /> REVEG ETATIDN SLAB AREA 1 5.00 <br /> R EVEG ETATIDN SURFACE AREA 5.0^ <br /> SLOPE CUT/FILL 2050 LINEAR FEET <br /> SLOPE ROCK FILL 1025 LINEAR FEET <br /> RES OIL @ 1 2~ 24,200 CUBIC YARDS <br /> EST/MATED UN/T COSTS FOR RECLAMAT/ON /TEMS: <br /> unit Cost <br />1. Revegetation Slab Area includes grass seed, <br /> mulch and fertilizer and labor to drill $ 500.00/AC. <br />2. Revegetation Surface Area includes grass seed <br /> fertilizer and labor to prepare site $ 125.00/AC. <br />3. Re-spreading soil and/or growth media with <br /> D-9 cat push distance 250 ft or less $ 0.193/YD3 1~ <br />4. Slope Reduction of mine face, 2050 lft; ave <br /> height 10 feet D-9 cat push distance 20 ft or less $ 0.109/YD3 ?/ <br />5. Slope Reduction rock fill, 1025 lft; ave <br /> D-9 cat push distance 100 ft or less $ 0.189/YD3 ?/ <br />RECLAMAT/ON COSTS <br />1. Revegetation, 15.00 ac @ $500.00/ac $ 7,500.00 <br />2. Revegetation, 5.00 ac @ $125.00/ac 625.00 <br />3. Recoiling, 24,200 yd3 @ 19.30/yd3 5,216.85 <br />4. Slope Reduction of mine face, 8825.25 yd3 @ 10.30/yd3 784.86 <br />5. Rock fill at mine face, 4479.25 yd3 @ 18.90/yd3 846.33 <br /> Net Total $14,973.04 <br />5. Indirect costs <br /> Mobilization 1,961.10 <br /> Insurance, Bond, b P rofit 1,875.37 <br />6. Administration costs 1 497.30 <br /> TOTAL ESTIMATE <br />RECOMMEND BOND BE SET AT 520,300.00 <br />1/ Figured using Cet Handbook and rental costa from locnl sources for 838 effi- <br />ciency, D-9 dozer, for eastern Coloredo. <br />34 <br />