Laserfiche WebLink
RECLAMATION PLAN • <br />• EXHIBIT E (CONY) <br />complete so that shortly after mining ends, probably by the end <br />of the second fall, all resoiling and revegetation will be <br />complete. The area will then be monitored for success of <br />revegetation until it is released by the Board. The operator <br />estimates that this will happen 3 to 5 years after mining is <br />completed, <br />If revegetation problems occur before release, an analysis <br />of the site will be made and the area will be revegetated again <br />as necessary. The seed mixture and rates may be revised as <br />needed to complete reclamation. If a modification is required, <br />the Division will be notified in the next annual report after the <br />change was made. This gives us the most flexibility to complete <br />reclamation successfully. <br />RECLAMATION TIMETABLE <br /> Acrest <br />Phase Years Total Area Revegetation Pre <br />Law Stone <br />Yard Road Undisturbed <br />1 3-5 142.52 117.24 6.86 7.88 7.03 3.51 <br />2 3-5 187.17 174.74 0 0 5.71 6.72 <br />TOTALS 3-5 329.69 291.98 6.86 7.88 12.74 10.23 <br />25 <br />