My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135523
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:14 PM
Creation date
11/26/2007 3:36:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990144
IBM Index Class Name
Permit File
Doc Date
11/28/1990
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. l • ~ ~ <br />PRODUCT REnOVAL ' <br />Cubic yards or tons of: Overburden; Coal; 30,000 Rock: Other <br />EQuipment to be used (end loader, dragline, shovel, etc., include capacities): <br />UD CO IO e ~. loaders (rnm rnrk ct nrkriilrc <br />Product Transportation (include on and off property) by conveying and unpaved haul road: <br />No.of Trips Ave.Vehicle Mileage per <br />Capacity No.of Trucks No.of wheels per day speed day per Truck <br />1• 25 Tons 6 <br />Haul <br />Trucks: 2. <br />3- <br />4. <br />18 4 10 mph 240 <br />From <br />Haul Road and Conveyor Distances: 1. A.H. 96 <br />2. <br />3. <br />4. <br />5. <br />To Distance (miles) <br />Pit Stockpiles 0.25 <br />Description of controls for unpaved haul roads: Water Trucks <br />Description of Controls for Conveyors: spray bars on conveyors to stockpile <br />LOADOU7 TO GRIZZLY OR STOCKPILE <br />Description of loadout (truck bottom dump, [ruck end dump, conveyor, pneumatic elevator etc.): <br />Excavation by Labor to plant, [hru plant, conveyor to stockpile <br />T <br />Description of Controls (watering, chemicals, etc.): eater sprav bars on plants 8 convevors <br />STOCKPILE (RAW) <br />Cubic yds. or tons of: Overburden Coal 20. 000 Rock <br /> 10,000 <br /> Topsoil crushe r fines. natural 3/4"min nQther(Descrlbe) <br /> <br />Method of loading into pile (conveyor, stocker, end loader, etc.): all mater ials oinc~r <br /> <br />stacked Willi loader or stacker <br />spray bars i n <br />Controls: ~l.anes Length of time stockpile remains undistruhed uD to 550 days <br />-~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.