My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135522
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:14 PM
Creation date
11/26/2007 3:35:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 7 Archived Section 2 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Richard Atkinson <br />• May 14, 1981 <br />Page Four <br />Using the disturbed area percentages as listed in the preceding tabulation <br />weighted CS values were computed with the results being; <br />Streeter Gulch, CS = 0.092 x 8.6% + 0.013 x 91.4% = 0.020 <br />Gulch A, CS = 0.092 x 15.4% + 0.013 x84.6% = 0.025 <br />The Adequacy Review also questioned the CR factor asking how many diversions <br />were used in its computation. In our calculations we had used a P factor, the <br />equivalent of thy: CR factor, of 1.0. This is the maximum value to kle used for this <br />factor and corre:;ponds to no diversions in the formula CR = 1 /(n+1)2. <br />Using the revised sediment delivery ratios and the weighted CS factor the 3-year <br />sediment yields have been recomputed with the results as follows: <br />Sedimentation Ponds <br />Taylor Gulch Streeter <br />Tributary Gulch <br />Sediment yield - 3 y~~rs <br />• previously competed (acre-feet) 0.92 <br />Sediment yield - 3 years <br />as revised (acre-•feet) 1.38 <br />Provided sediment <br />volume (acre-feet) 1.78(1) <br />1.07 <br />1.66 <br />Gulch Work Loadout <br />A Area Area <br />0.58 0.52 0.32 <br />1.17 0.62 0.74 <br />1.85 1.26(2)12.73 1.04 <br />(1) With principal spillway elevation revised from 6938.0 to <br />6939.0. No other changes needed. <br />(2) With principol sf~illway elevation revised from 6614.0 to <br />6615.0. No other changes needed. <br />4. Sediment Clean-out; The Adequacy Report requires that ponds have a sediment <br />marmar er~ins~d at the 60'/o sediment storage volume (60% of the 3 year sediment <br />yield) elevation. We concur with this requirement and the 60'/o elevations are <br />as follows: <br /> Elevations <br />SedimeniationPond Invert 60% Vo 100% Vo . <br />Taylor Gulc~ Tributary 6935.0 6937.3 6938.4 <br />Streeter Gulch 6581.7 6583.2 6583.8 <br />Gulch A bbl l .0 6613.8 6614.8 <br />• Work Area 7149.5 7149.7 7149.8 <br />Loadout Area 6381.0 6383.9 6384.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.