Laserfiche WebLink
Mr. Richard Atkinson <br />May 14, 1981 <br />Page Two <br />by use of the formula given in Haan and Barfield: <br />D-DA DV DC DP <br />where: <br />D =delivery factor <br />DA =area factor <br />DV =vegetative factor <br />DC = channelization factor <br />DP = pit factor <br />• <br />For D we had used factors from 0.27 to 0.30 taken from figure 5.23 on page 223, <br />Haanp'and Barrield; Dv had been computed of between 0.12 to 0.13, but used in <br />the equation ah 0.60 due to stated limitation that the product of DpD should be <br />at least equal to the lower of D or D for normal vegetation. Va" fues of 1.0 <br />had been used for factors DC and DP in the formula. <br />In review of the literature, discussioru with others working with sedimentology <br />in Colorado and with Mr. Domigue we conclude that in light of the limited know- <br />ledge in Western wvtersheds that it is appropriate and conservative to use values <br />less than 1 for only the area factor and to use 1 for the other 3 factors in the Haan <br />and Barfield formula, With this assumption the recomputed sediment delivery ratios <br />compared with the previous sediment delivery ratios for the mining area detention <br />ponds are: <br />Sediment Delivery Ratio <br />Detention Pond Previous Calculation Revised Calwlation <br />Taylor Gulch Tributary 0.17 0.26 <br />Streeter Gulch 0.16 0.25 <br />Gulch A 0.18 0.29 <br />The effect of the revised sediment delivery ratios on the calculated sediment yield <br />and pond designs is discussed at the conclusion of the response to USLE CP Factors. <br />3. USLE CP Factcrs: The Adequacy Review questioned the selection of C factor <br />for straw mu c ing from USDA Technical Note 50. The selected value from this <br />publication was, C = 0.02 for 4 tons of straw mulching per acre. The soil loss was <br />then computed using this value of C at 3.17 tons per aQe per year. Next the <br />total sediment yield for 3 years was computed for each of the sedimentation ponds <br />by converting tans of sediment to acre feet of sediment and multiplying by the <br />drainage area c•f each pond and by 3 years. <br />C~ <br />J <br />