Laserfiche WebLink
• <br />NEW CASTLE ENERGY CORPORATION <br />Emission Permit No: SSGA335 (3) <br />Initial Approval <br />Page 2. <br />4. Construction of this source must commence within 18 months of initial <br />approval permit issuance or within 18 months of the start-up-date <br />stated in the application. If commencement does not occur within <br />the stated time frame the permit will expire on <br />(See General Condition No. 6., Item 1 on the reverse side of the first <br />page of this permit). <br />5. Emissions of air pollutants shall not exceed the following limitations <br />(as calculated in the Division's preliminary analysis): <br />Particulate Matter: 0.05 lbs./hour and 0.01 tons/year. <br />Sulfur Dioxide: 0.05 lbs./hour and 0.01 tons/year. <br />Nitrogen Oxides: 0.70 lbs./hour and 0.17 tons/year. <br />Volatile Organic Compounds: 0.05 lbs./hour and 0.01 tons/year. <br />Carbon Monoxide: 0.15 lbs./hour and 0.04 tons/year. <br />r 1 <br />U <br />J <br />6. This source shall be limited to a maximum consumption rate as listed <br />below and all other activities, operational rates and numbers of <br />equipment as stated in the application. Annual records of the actual <br />consumption rate shall be maintained by the applicant and made available <br />to the Division for inspection upon request. <br />Consumption of of diesel fuel shall not exceed 1.5 gallons/hour or 735 gallons/yea <br />7. Each time this equipment is moved to a new location within the State <br />of Colorado for a period of thirty (30) days or longer, the applicant <br />shall file a Revised Air Pollution Emission Notice at least thirty (30) <br />days prior to relocation. <br />Ey: ~i_._ Y~1~~ <br />Review Engineer <br />Ey : ~~-~fiL <br />es S. Geier, P.E., Chief <br />ew Source Review Section <br />Stationary Sources Program <br />Air Pollution Control Division <br />