My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135446
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:10 PM
Creation date
11/26/2007 3:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
11/21/2003
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sectiom - 2.05.3 <br />A transfer point will allow coal refuse or mine development waste to be diverted through a <br />discharge chute to a temporary stockpile. As material accumulates in this pile it will be <br />loaded and hauled to the West Valley ttll disposal area. The conveyor will have a capacity <br />consistent with the maximum annual production rate of 4,800,000 tons annually. The <br />conveyor design includes partial covers for dust control, walkways fox inspection and <br />maintenance, and emergency stop controls in compliance with applicable MSHA safety <br />regulations. <br />L. North Elk Creek Soil Stockpfle -The existing Elk Creek soil stockpile will have to be <br />moved to accommodate construction of the new Sedimentation Pond D. Soil materials <br />from this existing stockplle will be placed, along with all soil recovered from the Elk Creek <br />Mine surface facilities disturbance area, in a new soil stockpile constructed on the east side <br />of Elk Creek, near the northern limit of the new mine disturbance area. Projected stockpile <br />capacity is approximately 65,200 (18,600 cy from existing stockpile, 46,600 cy soil salvage <br />from Elk Creek Mine disturbance areas) cubic yards and will be verified by survey <br />following completion of soil relocation stockpiling activities. Compliance with applicable <br />design and stability requirements is addressed by the Slope Stability Analysis For Elk Creek <br />Mine Portal Bench Fills and Soil Stockpile (Montgomery Watson, 2000). Additional details <br />on soil material handling and storage are provided in Section 2.05.3(5). <br />M. Petroleum Storage Facility/ Washbay Facility - A combination petroleum storage facility/ ~° ~ <br />washbay facility is located south of the Elk Creek portals. The faciGtp is a combination ~..~`% <br />cinder block wall construction on a concrete foundation. It houses bulk fuel, oil and I r~~ <br />emulsion tanks and drum, tote and pail lubricant storage. The washbay includes a steam ,A ~ <br />cleaner, sediment sump and a oil water separator system. aLL <br />TR-44 2.05-23a Revised October 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.