Laserfiche WebLink
E -9000 <br />E -8000 E -7000 E -6000 E -5000 <br />E -4000 <br />Q <br />I\ <br />M I IN <br />J <br />�, <br />t <br />MIA <br />IFA <br />"' Mom <br />i <br />E -3000 <br />E -2000 <br />r / - ` ediment <br />Pond 010 <br />r 1 , <br />I� <br />I <br />I <br />1j <br />t/ <br />E -1000 <br />n <br />E -0.0 <br />F1 <br />E 3000 <br />M <br />0 <br />/ <br />ANS <br />N -28000 <br />W PrSk <br />rok <br />E <br />LI <br />O <br />cc f <br />Z <br />J <br />w <br />0 <br />a <br />LL E -10000 <br />0 <br />Q <br />U <br />0 <br />E -9000 <br />I <br />1 <br />r <br />1 <br />r' <br />20 <br />M <br />:111 <br />E -7000 <br />E -60)00 <br />E -5000 <br />N -40000 <br />E -2000 E -1000 E 0.0 E 1000 E 2000 E 3000 <br />\ c <br />LEGEND - <br />37382 2 <br />Surface Disturbance Boundary <br />® Permit Boundary <br />Stream PROFESSIONAL ENGINEER'S STA TEMENT <br />=�� Topsoil Stockpiles l Robert J. n slate 1051 the changes <br />in revision PR -02 R-02 tooted 81051 were prepared <br />E �� - Dunder my supervision and a// information presented <br />Pond Area REC hereon is true and correct to the best of my <br />�Q� <br />Q% 2g05knowtedge n information. <br />L e i <br />� rV1S . 0 1 iee�ets° ale Robert \J S evting, CO P.E. 37382 <br />YOAST MIME L.O.M. ESTIMATE <br />7 Issued lot PR -02 8105 JJames K.Conrath R.Shevling <br />N -42000 <br />B Issued for TR -25 09104 James D.Gallery R.Shavling <br />1995 -1999 (Permit Term 1) - DISTURBANCE AREA 5 Issued for TR -23 07103 JJames N. Gonzalez Rsnavlmg <br />2000 -2004 (Permit Term 2) - DISTURBANCE AREA 4 Issued for TR -22 11102 JJames K.Conrath T.Laidich <br />3 Issued for TR -21 9102 James J Gates T. Laidich <br />2 TR -11 Responses 6/99 T.Leidich T.Leidich MAltavilla <br />1 Submitted For TR -11 5126199 JJames MMathisen MAltavilla <br />O Issued for Final Report 2117199 J.James MMathisen M.Altaville <br />REV. REVISIONS DATE DESIGN BY DRAWN BY REVIEWED AND <br />No. SIGNED BY <br />JAW <br />S ENECA <br />Coal Company <br />PROJECT: <br />YOAST MINE <br />!7 <br />DRAWING TITLE: <br />OPERA TONS PLAN <br />SCALE TOPSOIL REMO VAL <br />N -44000 <br />4W o aoo� leoo� <br />E -4000 E -3000 Sheet l Of 1 Sheets <br />CONTOUR INTERVAL 5FT. <br />MWH SCALE: EXHIBIT No. <br />P lz d a As Shown 12 - <br />