Laserfiche WebLink
i <br />', <br />I <br />~ , <br />t <br />t <br />1 <br />1 <br />• <br />The following general equipment profile is anticipated: <br />1. Jaw crusher <br />2. Cone crusher (Phase II) <br />3. 3 Loaders <br />4. Bulldozer (D8) <br />5. 2 Scrapers <br />6. Scale and scale house <br />7. Several yazd conveyors <br />8. 3 Radial stackers <br />9. 1-10 on-highway trucks <br />10. Wash plant (if feasible) <br />• <br />The following man power requirements aze forecast: <br />1. Foreman <br />Z. 3 Loader operators <br />3. Bulldozer operator <br />4. 2 Scraper operators <br />5. 2 Plant operators <br />6. Mechanic <br />7. Up to 10 haul truck operators <br />It is important to recognize that haul truck quantities and operators will be <br />dependant on the final delivery point of the material and the size of current contracts. <br />