Laserfiche WebLink
HOURLY PRODUCTION <br />• HaulingCapacity: <br />Scraper Payload (weight) Basis <br />Material weigh : 2,075 poundslLGY <br />Material description : <br />USER-PROVIDED WEIGHT DATA <br />sheet 2 of 2 <br />X94 <br />Rated payload : 75,000 pounds <br />Payload capacity : 36.14 LCY <br />• <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Scraper Bowl (volume) Basis <br />Struck volume : 27.00 LCY <br />Heaped volume : 37.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY "` <br />hoary protlurAOn relleris wMUme per scraper pair an push-pun models <br />ob Condition Corrections : Ske altitude (ft.) : 7,500 <br />Scraper Push dozer I Source <br />Scraper loading time' : 1.00 minutes AMitude adj.: 1.000 NA i (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job effiaency : 0.830 NA (Cat HB) <br />• batl time per scraper pair on push.pun models Net COneCflOn : ~ 0.830 ~ NA ~ <br />Cvcle Time <br />Seg. # Haul distance (feet) ~ Grade (%) Roll. res. (%) I Total res. (%) ~ Velocity (fpm) Travel time (min.)*• <br />1 3,000 -10.00 5.00 -5,00 2972 1,05 <br /> <br /> <br /> <br /> I <br /> <br /> <br /> <br />Haul time : 1.05 minutes <br />Retum route <br />"travel time rot each segment is adjusted rot acceleratton/tleceleration, Retum time : 2.89 minutes <br />table velocities are max. attainable per total resistance shown. not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 5.55 minutes <br />Unadjusted unit produdion/hour : 562.61 LCY/hour "` Adjusted for job conditions : 466.97 LCY/hour <br />Optima! number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single suaper team (unit) hourty produriion : 466.97 LCY/hour <br />Adjusted multiple scraper team (fleet) hourty production : 933.94 LCYlhour <br />. JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : 89,9$ Hours <br />Unit cost : 51.479 lLCY Total job cost : $124,259 <br />/3-/-7D <br />